Major roadworks on the region's state highways for the coming week are listed below to help you plan your journey.
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. Plan ahead as roadworks on the state highway network may affect your journey times.
NOTE: Weather or other factors may cause roadworks to be postponed to the next suitable day or night.
NOTE: Paekākāriki Hill Road is closed 3pm to 7pm on Friday 1 February, 8 February, 15 February and 22 February. No through traffic. Local access only. These are part of a series of trial closures to improve safety and smooth traffic flow.
View Paekākāriki Hill Road closure trial results
Location |
Type of work |
Hours |
Sun 17th |
Mon 18th |
Tue 19th |
Wed 20th |
Thu 21st |
Fri 22nd |
Sat 23rd |
Wellington, Cobham Drive Lane closed both ways |
Lighting upgrade Cycle lane installation |
8pm-5.30am |
✓ |
✓ |
✓ |
✓ |
✓ |
|
|
Tawa southbound offramp CLOSED Detour via Churton Park ramps |
Barrier repair |
10pm-4.30am |
|
✓ |
|
|
|
|
|
South of Porirua Lane closed both ways |
Transmission Gully Project |
7pm-5am |
✓ |
✓ |
✓ |
✓ |
✓ |
✓ |
|
Mana Esplanade Southbound lane closed |
Broadband |
9.30am-3pm |
|
✓ |
|
|
|
|
|
Paekākāriki Hill Road CLOSED to through traffic Local access only No exit onto SH1 |
Traffic safety trial |
3pm-7pm |
|
|
|
|
|
✓ |
|
Kāpiti Expressway, near Waikanae Southbound lane closed |
Road repairs |
5.30pm-5.30am |
|
✓ |
✓ |
✓ |
✓ |
✓ |
|
Old SH1, Paraparaumu Southbound lane closed |
Electrical services |
7.30am-5pm |
|
✓ |
✓ |
✓ |
✓ |
✓ |
|
Old SH1, Waikanae, north of railway station to Hemi Street Stop/go traffic control
No parking where marked |
Asphalt resurfacing North Waikanae revocation project: turning the former state highway into a local road |
7am-5pm |
|
✓ |
✓ |
✓ |
✓ |
|
|
Old SH1, north Waikanae Altered lane layout
No parking where marked |
Shoulder widening North Waikanae revocation project: turning the former state highway into a local road |
7am-5pm Also Sat 16th |
|
✓ |
✓ |
✓ |
✓ |
✓ |
|
North Ōtaki Altered lane layout Prepare to stop on request |
Peka Peka to Ōtaki Expressway project |
6pm-5am Also Sat 16th |
✓ |
✓ |
✓ |
✓ |
✓ |
✓ |
|
Manakau south Stop/go traffic control |
Chipsealing |
7pm-5.30am |
|
✓ |
|
|
|
|
|
Ohau Stop/go traffic control |
Chipsealing |
|
✓ |
|
|
|
|
|
|
For two days after chipsealing 30km/h temporary speed limit |
Settling the seal |
Day/night |
|
✓ |
✓ |
✓ |
|
|
|
Location |
Type of work |
Hours |
Sun 17th |
Mon 18th |
Tue 19th |
Wed 20th |
Thu 21st |
Fri 22nd |
Sat 23rd |
Lower Hutt, north of Kelson lights Southbound lane closed
|
Drain clearing |
7pm-5.30am |
|
✓ |
|
|
|
|
|
Upper Hutt, Brown Owl Stop/go traffic control |
Line-marking |
7pm-5.30am |
|
|
|
|
|
|
|
Upper Hutt, Brown Owl, south of Norana Road Altered lane layout
|
Tree felling |
9am-3.30pm |
|
✓ |
✓ |
✓ |
✓ |
✓ |
|
Location |
Type of work |
Hours |
Sun 17th |
Mon 18th |
Tue 19th |
Wed 20th |
Thu 21st |
Fri 22nd |
Sat 23rd |
Pauatahanui roundabout Stop/go traffic control |
Transmission Gully project |
8pm – 5am |
✓ |
✓ |
✓ |
✓ |
✓ |
✓ |
|
Judgeford, north and south of Moonshine Road, 1km Stop/go traffic control |
Chipsealing |
7pm-5.30am |
|
|
✓ |
✓ |
|
|
|
For two days after chipsealing 30km/h temporary speed limit |
Settling the seal |
Day/night |
|
|
|
✓ |
✓ |
✓ |
|
Animation, long version:
Animation, short version: